Three bidders needed for £1billion Transport for London (TFL) Silvertown Tunnel project

untitledEast London road tunnel project to take four years to construct with 25 year operational phase

Transport for London (TFL) are starting the hunt for at least three main bidders for the £1billion Silvertown road tunnel, to be situated just east of the Blackwell Tunnel.

This tunnel looks to connect the A1020 Silvertown Way to the north with the A102 Blackwall Tunnel approach to the South. At present, the plan is to charge road users to help fund the scheme and reduce congestion in the area.

Construction is expected to begin in 2018/2019 and will aim for completion in late 2022 or early 2023.

TfL will award the project as a design, build, finance and maintenance deal in east London, which will include a four-and-a-half-year construction phase, followed by 25 years in operational phase.

Bidders will have until the end of November to submit prequalification documents. This presents those within several areas of the construction industry with the opportunity to be part of this landmark project for TfL.

Read the full article here.

You can access further information on the tender here.

Operating in over 125 business sectors, Win That Bid, and our partners, Thornton & Lowe provide a complete range of bid management, consultancy and business mentoring services, supporting our clients to bid for and win public and private sector contracts.

Our highly successful Bid Management function ranges from developing high level bid strategies, qualification tools and training, to assisting our clients with PQQs, ITTs and proposals.

If you are looking to succeed in bidding, please contact a member of our bid-management team at our head office on 01204 238094 or email: hello@thorntonandlowe.com

Speak Your Mind

*